Case Studies
Case Study 1
Ashby Access Improvement Works at United Biscuits Factory.
Name of client: CDPS Ltd
Contract start date: 06/08/18
Contract completion date: 03/10/18
Contract Value: £114,000.00

JSB Civils Ltd carried out two new site entrance road alterations for CDPS at United Biscuits factory. Works included breaking out existing surfaces, installing new concrete and tarmac surfaces and new high containment kerbs which replaced the standard HB2 kerbs which provided a safer access and egress to the entrance gates. In addition alterations to the gate barriers and turnstiles, drainage works and soft landscaping works finished the project to completion.
Case Study 2
New Travis Perkins Trading Branch at Loughborough
Name of client: Stepnell Ltd
Contract start date: 16/10/18
Contract completion date: 01/03/18
Contract Value: £260,042.00

JSB Civils Ltd carried out a new Travis Perkins Unit at Loughborough. Works included foundations, drainage, external works and new Lego block retaining wall. This development provides Travis Perkins with a trading unit situated at Loughborough.
Case Study 3
Infrastructure works for new housing development at Wilmot Lane Nottingham
Name of client: Charterpoint Ltd / Bowmer & Kirkland Ltd
Contract start date: 29/05/18
Contract completion date: 31/10/18
Contract Value: £590,000.00

JSB Civils Ltd carried out a major new carriageway for a housing development in Nottingham. JSB Civils Ltd undertook this project as the principal main contractor undertaking all aspects of the project to completion with the client. Works include new foul and surface water mains drainage to Seven Trent standards, new S228/38 carriageway road surfacing works to highways standards and new street lighting works.
Case Study 4
​
New World War 1 Roll of Honour Centenary War memorial on Victoria Embankment Nottingham
​
Name of Client: Lindum Group Ltd
Contract start date: 18th February 2019
Contract completion date: 21st August 2019
Contract Value: £47,019.08
​
​
​
​
​
​
​

JSB Civils Ltd carried out a prestige project for a World War 1 Roll of Honour War memorial, on Victoria Embankment Nottingham. Works included site preparation, forming the new circular embankments and centre monument, drainage, up lighting, breedon gravel to the surrounding footpaths and the inner circle with resin bonded gravel.